Specifications
Warehouse metallic roof structure1.fewer materials
2.low cost
3.short building cycle
4.beautiful
Warehouse metallic roof structure
Description:
Warehouse metallic roof structure is a new type of building structure system, which is formed by the main steel framework linking up H-section, Z-section, and U-section steel components, roof and walls using a variety of panels and other components such as windows and doors. Warehouse metallic roof structure is widely used in warehouses, workshops, large factories, and so on.
Materials:
1. The main frame (columns and beams) is made of welded H-style steel.
2. The columns are connected with the foundation by pre-embedding anchor bolt.
3. The beams and columns, beams and beams are connected with high intensity bolts.
4. The envelop construction net is made of cold form C-style purlins.
5. The wall and roof are made of color steel board or color steel sandwich panels, which are connected with the purlin by Self-tapping nails.
6. Doors and windows can be designed at anywhere which can be made into normal type, sliding type or roll up type with material of PVC, metal, alloy aluminium, sandwich panel and so on.
Main Steel: Q345,Q235
Column&Beam: H-type steel, C purlin, square steel tube
Wall&Roof: EPS, Rockwall, PU sandwich ,glasswool panel, color steel or galvanized or galvalume corrugated steel sheet
Door: Roller shutter door or Sliding door or swing door (sandwich panel door)
Window: Plastic steel or Aluminum alloy window
Surface: Hot dip galvanized or painted (usually grey painting, twice)
Crane: 5T,10T,15T,20T,30T ect.
Characteristics:
1. Widespan: single span or multiple spans, the max span is 36m without middle column.
2. Low cost: Unit price range from USD35/m2 to USD150/m2 according to customer’s request.
3. Fast construction and easy installation.
4. Long using life: up to 20 years
5. Others: environmental protection, stable structure, earthquake resistance, water proofing, and energy conserving.
Terms:
Payment: L/C or by T/T(30% prepaid as deposit,the balance 70% before shipment)
Delivery time: 15~40 days, usually as customers's order
Shipment: 20'GP,40'GP,40'HQ.
Applications:
Steel workshop/warehouse/shed, Exhibishion Hall,Office buildings, Garage,Multy-story building,Hanger,Agricultral storage,Logistic centers,and all kinds of steel materials.,etc.