Specifications
Warehouse ,prefab workshop,metal building,coal power plant1.light weight
2.big span
3.long duration;50years
4.low cost
Warehouse ,prefab workshop,metal building,coal power plant
Features:
1) Prefabricated and customized design
2) Low foundation cost, thanks to the light weight of the structure itself
3) Easy construction, time-saving, and Labor saving
4) Flexible layout, beautiful appearances, and higher space efficiency
5) Steel structure workshop Can be used as warehouses, workshops, shopping mall, dinning hall, stadium etc.
Warehouse ,prefab workshop,metal building,coal power plant Materials:
EPS/rock wool/glass fibre sandwich panel for wall and roof.
C section steel, Z section steel, square steel tube, H shape beam for framesteel structure
aluminum alloy shutter window and the plastic-steel for window.
EPS/rock wool/glass fibre sandwich panel/steel/plastic steel/wooden/aluminum alloy door
shoring, cross bracing, tie-bar, intercolumniation. High-strength bolts and other components.
Futures:
connection method: welding
anti-distortion, earthquake, wind and load.
steel structure with service life over 50 years.
steel anti-corrosive.
Maximization of available constructing space.
Surface treatment: static powder coating spray/zinc galvanized/anti-corrosion finish paint.
12 workers can complete one warehouse of 3000 m2 in ONE month.
Our Services:
Reduce cost by integrating &manufacturing &service processes
with reliable quality and efficient service.
offer one-stop service from developing, design, manufacturing to installation
sizes and design as requirements.
Welcome to use our Temporary light metal building !
The following information we need to know before making the drawing and price of Warehouse ,prefab workshop,metal building,coal power plant:
1 Location (where will be built?) _____country, area
2 when do you want to start the project?
3 What does it used for?
4 Size: length*width*height _____m*_____m*_____m
5 wind load (max. wind speed) _____km/h
6 snow load (max. snow height) _____kn/m2, _____mm
7 anti-earthquake _____level
8 brickwall needed or not If yes, 1.2m high or 1.5m high
9 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m