Large-Scale demountable design steel structure workshop
No.1 General Description of steel structure workshop
No.2 Reference picture for steel strcture
No.3 Material for workshop
No.4 Detailed information on workshop
Wokrshop Main Structure | ||||
No | Category | Description | ||
1 | Main structure |
web plate:6-32mm / wing plate:6-40mm | ||
2 | Second steel structure | Steel (Q235,painted or galvanized for surface treatment) | ||
Maintenance | ||||
No | Category | Description | ||
3 | Roof | 0.35,0.4,0.5mm/50,75,100mm EPS, Rock wool, Fiber Glass / 0.35,0.4,0.5mm sandwich panel | ||
840 type steel tile, thickness 0.5mm | ||||
4 | Wall | 0.35,0.4,0.5mm/50,75,100mm EPS, Rock wool, Fiber Glass / 0.35,0.4,0.5mm sandwich panel | ||
840 type steel tile, thickness 0.5mm | ||||
5 | Windows | Plastic steel window / Aluminium alloy window | ||
6 | Doors | EPS composite board sliding door / Roller door | ||
Fittings | ||||
No | Category | Description | ||
7 | Edge cover | Steel sheet , thickness 0.5mm | ||
8 | Bolt | M24 embedded bolt | ||
Intensive bolt | ||||
Galvanized ordinary bolt | ||||
9 | Daylighting band | 1.2mm glass reinforced plastic |
No.5 Section Steel Production Process
No.6 Our corporate goals
6.1 Help every customer achieve his or her objectives
Our every success is derived from the complete satisfaction of our valued customer, no matter how much better our buildings might be in abstract,it only makes a difference when a specific customer gets an exact building they want at a good price;That is why our process is designed to listen to the customer from the beginning to the end,and this is the reason why our customers are fans of Xin guang zheng;
6.2 Steel building is a superior alternative to the usual building
Steel building is short in construction period , low in cost ;Our 4-step process is :
Further talk with customer to understand customer's requirements;
Freely design and estimate cost;
Fully supply unit price for every single component invoilved;
6.3 Eliminite the middleman hassle and waste
We aim to offer the best service to our customer,so to eliminite the middleman hassle and waste,we ourselves disign,manufacture and deliver.
No 7 Short introduction for our company:
Our company is established in 1996,has been in steel structure building,container house,prefabricated house,related building materials,various matchines for almost 20years,So I am fully confident in supplying you the relavant products.