1. Base: Light gauge steel frame prefabricated house
Concrete and steel foundation bolts
2. Column and beam: Light gauge steel frame prefabricated house
material Q345(S355JR)or Q235(S235JR) steel, all bolts connection ,straight cross-section or Variable cross-section
3. Bracing: Light gauge steel frame prefabricated house
X or V or other type bracing made from angle , round pipe etc.
4. Galvanized C or Z purlin, Light gauge steel frame prefabricated house
size from C100~C320,Z160~Z300
5. Roof and Wall Panel: Light gauge steel frame prefabricated house
(a) Single colorful corrugated steel sheet --Thickness:0.12-1.2mm; Width: 310-1150mm, etc.
(b) Sandwich panel with EPS, rock wool, glass wool , PU etc. insulation -- Thickness around 50mm~150mm;Width 950mm or 960mm!
6. Accessories:
semi-transparent skylight belts, Ventilators, down pipe, out gutter etc
7. Surfrace:
Paint or hot dip galvanized
Characteristics
1. Safe and high wind resistance.
2. Low cost.
3. Fast construction and easy in installation.
4. Long term service life: more than 25 years.
5.Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.
Installation
Installation is very easy, we can dispatch our technician go to guide and teach the worker. The steps as following, you can have a reference firstly:
1. Frame the foundation. ( Usually use string and ruler to got the exactly position according to the steel frame size and the drawing)
2. Get the level position
3. Dig a hole for embedded part.
4. Measure the same level of column, and marked the position
5. Fix the column with the cement according the marked position above(Not the soil on the show, we just make a demonstration)
6. Up the roof steel frame and the purlin both on roof and wall, then weld them together (for fix the wall)
7. Cover the wall panel and fix it with the screw
8. Up the roof panel
9. Using the slit foam and rubber coating and sand full of the slit among the panels
10. Using the mesh cloth, and paint connect the slit among panel.
12. Put the blue steel plate on the top of the roof, use screw to fix it.
13. Connect the C purlin in the room (to fix the partition panel).
14. Fixed the partition panel.
15. Install the backbone tile on the highest top of the roof.
16. Seal the roof panel and fix the steel plate.
17. Paint the whole house.
Cage equipment
Project
About us
Product range:
Steel structure building,steel workshop and warehouse,container house ,prefabricated house etc.
Exporting countries:
Our products have been exported to more than 60 countries and regions,such as Canada,Australia,Brazil,Germany,New zealand ,Russia ,Panama,US etc.
Corporate Strength :
Registered capital: USD 5 Million
Employees Total: More than 600
Designers Total: More than 40
Factory Size:5 factories, total area more than 145000 Square meters
Product Description:
Standard: GB, ISO9001: 2008,European,ASTM,BS.
Certificate: SGS,BV,CE
Terms:
Payment: T/T or by L/C(30% prepaid as deposit, the balance 70% before shipment)
Delivery time: 15~40 days, usually as customer’s order
Shipment: 20’GP, 40’GP, 40’HQ, 40’OT or in bulk
FAQ:
1. What is steel prefabricated house mean and made of?
RE: Steel prefabricated houses are made of high grade painted steel frame/structure as strong skeleton and lined with sandwich panel as wall and roof, these are pre-designed and manufatured in the factory and later assembled on site.
2. Is it safe and can suit to any kind of stringent weathere conditions?
RE: Our houses could resistant earthquake, wind, snow, etc.
3. Can you supply design service?
RE: Yes.also supply design service.
4. How long is delivery?
RE: Generally, the delivery time of sandwich panel is within 7 days; and 30 days for prefabricated house. The exact delivery time should depend on the quantity and confirm with factories.