Product Details

turkey steel factory prefabricated concrete warehouse

Place of Origin Shandong, China (Mainland)
Brand Name Xinguangzheng
Min.Order Quantity 100 Square Meter/Square Meters
Price US $35 - 55/ Square Meter
Delivery Time 30days after receiving deposit
Payment Terms paypal,UnionPay, Visa/MasterCard, Amex, Discover,T/T
Supply Ability 2000 Ton/Tons per Month

Product Features

turkey steel factory prefabricated concrete warehouse

 

1. Main materials used for prefabricated concrete warehouse :

  

  • Main steel structure: welded H steel; Q345B materials.
  • Purlin: C section steel;
  • Roof panel: fiberglass 50mm sandwich panel;
  • Wall: with 1.2m brick wall ,75mm corrugated sandwich panel above 1.2m;
  • Tie bar: Q345B round tube;
  • Brace: round steel;
  • Lateral and column bracing: round steel;
  • Knee brace: hot- rolled angle steel;
  • Trims,flashing: color steel sheet;
  • Gutter:color steel sheet;
  • Downpipe: PVC;
  • Door: sandwich panel door;
  • Window: Aluminium window (single glass)
  • Usage : Workshop , warehouse, office building

 

Company Information

2. Brief introduction of Qingdao Xinguangzheng Steel Structure Co., Ltd.

 

Located in China and founded in 1996, Qingdao Xinguangzheng Steel Structure Co., Ltd. specializes in designing and manufacturing steel structure buildings, steel structure workshop, steel structure warehouse, prefabricated house, container house and light steel villa. Simultaneously we also may according to the client different need to change and make the order. 

Our steel structure buildings, steel structure workshops, steel structure sheds, prefabricated houses and container houses are not only sold all over the country, but also exported to Japan, South Korea, the United States, European, UAE, Australia, Africa and other countries and regions. 

 

 

3. QA/QC Introduction

Our Quality Control Department was established in 2000. It is under direct control of the General Manager....

There are 12 professional Quality Supervisory Controller in the team,80% of whom are engineers and technicians.

The team are technically well qualified and has abundant testing experience. 

4. Production Equipment and Facilities

Machine NameBrand & Model No.Quantity
Multi-bead Cutting MachineCG1-4000A3
H-beam Assembling MachineHZJ10304
H-beam Welding MachineMZ-1000/25004
Straightening MachineNo Information1
Punching MachineNo Information1
Drilling MachineZ3080X251
Sand Blasting MachineNo Information2
Sawing MachineGB4026X2
Shearing MachineQC11Y-81
Bending MachineShuangfeng4
Steel Sheet Forming MachineNo Information10
Sandwich Assembly LineNo Information9
Sandwich Panel Cutting MachineMJ6128ZD1

 

 

 

 

5. Our services:

  • We reply each inquiry within 24 hours
  • develop and make new parts according to customers' requirements and detailed information.
  • customize buildings for specific applications.
  • provide service of designing, engineering, manufacturing and installation. 
  • our expert technicians can help you to assemble the project at site.
6. Pefabricated concrete warehouse we made before for your references: 

 

FAQ

 

The following information we need to know before making the price for prefab steel shed:

 

1Location (where will be built?)_____country, area
2Size: length*width*height_____mm*_____mm*_____mm
3wind load (max. wind speed)_____kn/m2, _____km/h, _____m/s
4snow load (max. snow height)

_____kn/m2, _____mm

5anti-earthquake_____level
6brickwall needed or notIf yes, 1.2m high or 1.5m high
7thermal insulationIf yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8door quantity & size_____units, _____(width)mm*_____(height)mm
9window quanity & size_____units, _____(width)mm*_____(height)mm
10crane needed or notIf yes, _____units, max. lifting weight____tons; max. lifting height _____m

 

 Believe your choice, we are doing better than ever. Your visiting is highly appreciated!

 

 

 

 

All Products Contact Now