steel structure warehouse details:
Material | Specification |
Length | Single slope, double slope, muti slope |
Width | Single span, double-span, Multi-span |
Height | single floor, double floors |
Column | Q235, Q345 welded H section steel |
Beam | Q235, Q345 welded H section steel |
Purlin | Q235 C channel or Z channel |
Knee brace | Q235 angle steel |
Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in Diferent colors&gauge |
Partition wall | sandwich panels (EPS, PU, Fiber glass wool etc.) available in Diferent colors&gauges |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout: | PVC |
Live load on roof | In 120kg/Sqm (Color steel panel surrounded) |
Wind resistance grade | 12 grades |
Earthquake-resistance | 8 - 9 grades |
Structure usage | Up to 50 years |
Finishing options | vast array of colors and textures available |
Paint Options | Gray paint, red paint, white paint, expoxy zinc etc. Or Galvanized |
Our Services
-We reply each inquiry within 24 hours
- develop and make new parts according to customers' requirements and detailed information.
- customize buildings for specific applications.
- provide service of designing, engineering, manufacturing and installation.
- our expert technicians can help you to assemble the project at site.
FAQ
1. ASK:If I would like to ask you design the steel building for, what information shall I provide?
ANW:The basic information is wind speed, earthquake magnitude and snow load, and your requirements for window, door, wall and roof cladding.
2.ASK: If I provide you EU/AU standard drawing, can you convert it into equal structural steel in your standard and quote me?
ANW:Yes, we can.
3.ASK:What is your delivery time?
ANW: within 45days for a 10000Sqm project.
4.What is your payment term?
ANW: T/T and L/C.
You will pay 30% advanced payment before production, and balance the rest 70% payment when goods are ready for shipment.